Quarrying and Crushing
- Owner:
- Cumberland Resources Ltd. / Agnico Eagle Mines Ltd.
- Location:
- 110 km from the township of Baker Lake, Nunavut
As part of our site development work, Tercon performed the initial blasts onsite, developed the quarries and crushed the material for air strip and tank pads. We also opened up the gravel esker located 8 to 12 km from site and transported the material to site using snow pack roads and frozen lakes as the transportation corridor.
- Owner:
- CP Rail Ltd.
- Location:
- Kimberly, British Columbia
Tercon was contracted to drill and blast material and then produce railway ballast near Cominco Metals Ltd. Sullivan Mine.
- Owner:
- Imperial Metals
- Location:
- Central British Columbia
Tercon was contracted to drill and blast material to be used in the tailings dam.
- Owner:
- Viceroy Resources
- Location:
- Brewery Creek Project
- Dawson City, Yukon Territories
As part of the contract for site development we opened up the quarry and produced the aggregate required for site work and co leach pad construction.
- Owner:
- Suncor Energy
- Location:
- Fort McMurray, Alberta
Tercon was contracted to perform drilling of the frozen muskeg during the cold months and the drilling in Suncor's limestone quarry in the warm months. The drilling of the muskeg in the winter lowered the muskeg stripping costs as the excavation was made easier, and substantially reduced wear on the equipment.